Battery Storage in Saudi Arabia: From Pilot Projects to a Bankable Asset Class

The case for battery storage in Saudi Arabia

Rising electricity demand, ambitious renewable energy targets and continued investment in industrial and digital infrastructure are reshaping Saudi Arabia’s power system and creating a growing role for battery storage.

According to the International Energy Agency (IEA), electricity demand in Saudi Arabia grew by an estimated 3.8% in 2025 and is forecast to increase by an average of 3.1% a year between 2026 and 2030. Industrialisation, urban development and population growth are driving consumption, alongside cooling requirements and emerging demand from data centres and other energy intensive industries.

At the same time, the Kingdom is targeting around half of its electricity from renewables by 2030 under Vision 2030. As intermittent solar and wind generation account for a larger share of supply, battery energy storage systems (BESS) become increasingly important in storing surplus electricity and releasing it when demand rises or renewable output falls. The government has set a target of around 48 GWh of storage by the end of the decade.

Saudi Arabia's rapidly expanding BESS market

Saudi Arabia is pursuing this ambition through two distinct models, combining utility led deployment with a growing programme of privately developed storage projects.

The first is deployment by Saudi Energy (formerly Saudi Electricity Company) and its transmission subsidiary, National Grid SA. In June 2026, the Kingdom commissioned a 2.5 GW / 12.5 GWh battery storage programme across five locations: Riyadh, Rabigh, Dawadmi, Jouf and Qassim. Delivered with BYD Energy Storage and Alfanar, it is one of the largest grid scale battery deployments globally, following the 2.6 GWh Bisha project and a 7.8 GWh system across three sites in the southwest of the Kingdom.

Alongside this investment, privately developed Independent Storage Provider (ISP) projects procured by the Saudi Power Procurement Company (SPPC) are opening the market to developers, investors and project finance lenders.

Group 1 comprises four projects with a combined capacity of 2 GW / 8 GWh. In August 2026, SPPC signed 15-year Storage Services Agreements (SSAs) representing investment of more than SAR 4.35 billion. A consortium of Saudi Energy, ACWA Power and Al Sharif secured three projects, while ENGIE and Haji Abdullah Ali Reza & Partners Co. Ltd (HAACO) secured the fourth. These agreements mark commercial close, with financial close, construction and commercial operation the next milestones.

As Group 1 progresses towards financial close, the Group 2 tender adds six projects totalling 3 GW / 12 GWh and has attracted 27 prequalified local and international companies, with bid submissions scheduled for November 2026.

Together, the first two groups represent 20 GWh of privately developed storage, providing an early test of whether the procurement framework can support a repeatable model for private investment at scale.

Contrast with a more established market

Having advised on energy and infrastructure projects in the UK before relocating to Saudi Arabia, I find the contrast instructive. The UK built one of Europe’s most established storage markets around frequency response, balancing services and wholesale arbitrage. Its experience with grid connection queues, revenue volatility, degradation and long term warranties has shaped how much debt projects can raise and on what terms.

Saudi Arabia’s ISP programme takes a different approach, using long term contracted storage services to provide revenue visibility without relying on wholesale price spreads. This reduces merchant exposure, but bankability still depends on how technical and operational obligations are allocated under the contract and reflected in the financing structure.

Managing project performance

Battery degradation is central to this assessment because storage capacity declines through both calendar ageing and cycling, while projects must maintain their contracted capacity over a 15-year term.

Meeting those obligations may require augmentation through additional battery modules or replacement capacity. The timing, cost and practical feasibility of this work can materially affect cash flows and returns, making the funding arrangements, whether reserves, operating budgets or supplier commitments, an important consideration.

Saudi Arabia’s climate compounds these challenges, as extreme summer temperatures increase the load on thermal management systems and raise auxiliary electricity consumption. Under these contracts, that consumption can carry a direct financial cost, alongside the effects of temperature on efficiency and degradation.

Equipment warranties and performance guarantees therefore need to support the project company’s SSA obligations in both scope and duration. Financial models must also capture the interaction between operating performance, augmentation expenditure and financing costs, since changes in these assumptions can materially affect debt capacity and equity returns.

What we are seeing on live transactions

Our work on bids and financings in the Kingdom shows how these risks translate into commercial and financing decisions, without commenting on any individual project.

Although the SSAs provide contracted revenues, the amounts received remain sensitive to operating performance. Payments are primarily capacity-based, with adjustments linked to availability, round-trip efficiency, auxiliary consumption and electricity imported from the grid, alongside O&M cost-recovery charges indexed partly to local and partly to foreign inflation. The interpretation of efficiency corrections at low utilisation, seasonal unavailability allowances and exchange rate provisions can therefore have a material effect on the tariff a bidder can offer.

Financing assumptions also differ between lender and sponsor cases. Lenders size debt against their own base case and cover-ratio requirements, without assuming refinancing, while many sponsors use mini-perm structures and incorporate refinancing benefits into the equity case that informs their tariff. Margin step-ups and cash sweeps apply if refinancing does not occur as planned. With 15-year contracts and little or no tail between final debt maturity and contract expiry, the treatment of refinancing is an important part of bid strategy and downside assessment.

Competitive pricing increasingly depends on these structuring decisions as well as capital costs. Although EPC prices have fallen, they remain the largest cost component, while equity and corporate bridging facilities, letters of credit, refinancing margins and timing, contingency releases and development fees all influence bid economics. In some bids, a meaningful share of equity value also comes from expected terminal value beyond the contract term, making the basis for that assumption particularly important when assessing returns.

From procurement to long term performance

Government support, centralised procurement and long-term contracts give Saudi Arabia a strong foundation for developing battery storage as a bankable asset class. Converting the growing pipeline into operating projects will depend on technical assumptions that reflect local conditions, contractual protections that support delivery and financing structures that can withstand weaker performance or delayed refinancing.

For developers and investors, the opportunity is increasingly clear, but the discipline lies in pricing it appropriately. As the market matures, projects will need to demonstrate that competitive tariffs can support reliable operations, debt service and sustainable returns throughout the contracted term.