PM E-DRIVE: Sanctioned but not installed

Resolving India’s public EV charging infrastructure gap across cities will be key to achieve the goal of mobility transition

Launched by the Ministry of Heavy Industries, Government of India in September 2024, the PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme seeks to accelerate India’s transition to green mobility while strengthening the domestic EV manufacturing ecosystem. The scheme’s total outlay of USD1,135.41 million (₹10,900 crore) was for the two-year period ending March 2026. In August 2025, the Ministry extended the scheme until March 2028 within the same outlay. As of September 28, 2026, USD88.646 million (INR851 crore) has been approved for the deployment of 8,147 chargers through three oil marketing companies and 10 states.[1] 

Incentives under the scheme cover electric two-wheelers, electric three-wheelers, e-buses, e-trucks, e-ambulances, and EV charging infrastructure. However, the installation of electric vehicle public charging stations (EV PCS) across the country remains a challenge. If one is to believe the reports, charging infrastructure hasn’t been able to keep pace with the scheme’s overall momentum.[2]

This fund allocation represents a fraction of the scheme’s broader capital outlay for public charging infrastructure, which aims to set up 72,300 public chargers nationwide by March 2028, i.e. by a factor of approx. 9X  from current levels .[3] With a smaller percentage of the overall charger targets approved and zero ground deployment, the progress stands in contrast to the rapid consumer adoption of electric vehicles under the same initiative.

What does it mean for the country?

The bottleneck in charging infrastructure creates a structural dynamic in India’s energy transition:

  • Mismatch between demand and supply: Under the scheme, vehicle adoption has been progressing, supporting the sales of over with 26.59 lakh electric vehicles reported as of June 2026 (predominantly 2-wheelers and 3-wheelers).[4] However, without a corresponding expansion in physical infrastructure, adoption may plateau, especially as 4-wheeler EVs and commercial fleets expand beyond localised urban hubs. One of the possible reasons could be the implementation through only three OMCs.
  • Amplified range anxiety: According to some market estimates and our own study a large percentage of potential EV buyers in India are discouraged by range anxiety—the fear of running out of charge without access to a charging station.[5] Moreover, India’s charger-to-EV ratio sits at approximately 1:235, well below international benchmarks like the International Energy Agency (IEA) recommendation of 1:6 to 1:20.[6] The lack of fast-charging infrastructure along intercity transit corridors continues to hinder long-distance EV travel.
  • Capital lockup: There is still much of the fund that lie unutilised. Idle capital under government schemes stalls potential multiplier effects across downstream supply chains, power distribution companies (DISCOMs), and local infrastructure developers.

The current state of charging infrastructure

India’s existing public charging network relies primarily on installations completed under earlier programmes, such as the Faster Adoption and Manufacturing of Electric Vehicles (FAME-II) initiative, alongside private sector rollouts. But that remains inadequate.

Additionally, there are challenges at regional level too. For instance, the charging infrastructure is concentrated in major metropolitan hubs (e.g., Bengaluru, Mumbai, Delhi-NCR, Pune). Intercity highways and Tier-2/3 regions remain underserved.[7] Hence, there is a need to decentralise the expansion of the proposed infrastructure.

Moreover, problems like offline chargers, payment processing glitches, and power grid trip-offs at public sites often make these less usable. Hence, there is a need to make the existing charging sites usable.

The public ecosystem lacks a unified interoperable protocol, forcing consumers to navigate dozen-plus proprietary network applications to locate, unlock, and pay for charges.

What can be done to make it a national priority?

  • Installing high-capacity fast DC chargers requires dedicated high-tension grid connections and transformer upgrades. Local DISCOMs often take 6 to 12 months to clear approvals and execute last-mile electrification. The process may be expedited with better planning and coordination.[8]
  • There is also a need to plan for high density areas, where deployments will be risk prone. Fast-charging clusters exert heavy surge loads on urban distribution transformers. Hence, there will be a need for localised battery energy storage systems.
  • Moreover, securing approvals from the urban local bodies, highway authority (NHAI), and approval for fuel outlet leases involves complex multi-departmental clearances. The hiccups need to be ironed out.Implementing agencies (including state utilities and Oil Marketing Companies) face prolonged procurement and vendor-selection cycles. The entire process of implementation from announcement to execution needs to be swift. Thus, the plan for developing the broader implementing base , including the involvement of private sector, may be designed.  
  • The country also needs to think about the profitability of the Charge Point Operators (CPOs). Due to the dominance of low-capacity 2-wheelers and 3-wheelers (which primarily charge via slow AC home/hub outlets), public fast-chargers face low use rates by 4-wheelers. This dynamic extends the capital payback period for CPOs.[9]
  • India often struggles with hardware and vandalism issues. Outdoor charging hardware faces extreme weather exposure, cable theft, connector damage, and inconsistent cellular connectivity for cloud management systems.

To transform the 72,300-charger goal from policy text into physical assets, actionable structural interventions are required:

Key interventions needed:

  • Involvement of larger set of implementing agencies.
  • Setting up of a Single-Window DISCOM clearances (Mandate 30-day grid hookups)
  • Seeking Right-of-Way (RoW) mandates (Deemed approvals along highways)
  • Common charging standards by way of Open Charge Point Protocol (OCPP) interoperability
  • Payment or award of subsidies only when the charging installation performs (Performance-Linked Subsidy Disbursements)

The gap between sanctioning funds for charging stations and achieving installations on ground highlights the execution challenges in India’s EV transition. While consumer vehicle sales under PM E-DRIVE continue to expand, the long-term sustainability of the ecosystem depends on physical infrastructure.

To hit the target of 72,300 public chargers by 2028, policy focus must shift from financial allocation to streamlining ground execution. Without these operational fixes, charging infrastructure risks remaining a key bottleneck in the nation’s clean mobility transition.

                                                          


References:

[1] PM E-DRIVE accelerates India’s electric mobility push with 26.59 lakh EV sales, ₹11,900-crore outlay - DD India

[2] ₹689 crore approved for EV charging network under PM E DRIVE, but no funds spent yet - BusinessToday

[3] 72,300 electric vehicle chargers by 2028: Can India's grid deliver?

[4] PM E-DRIVE accelerates India’s electric mobility push with 26.59 lakh EV sales, ₹11,900-crore outlay - DD India

[5] 58% potential EV buyers discouraged by range anxiety - Forvis Mazars; Electric-Vehicles-WEB-LOW-Report.pdf

[6] EV Charging Stations In India Are Booming: Should You Buy An Electric Car In 2026? | TOI Auto

[7] Charging Infrastructure: The Missing Link in India’s EVs Transition

[8] EV_Handbook_Final_14Oct.pdf

[9] Winning-the-EV-Charging-Race.pdf

Want to know more?